FFmpeg browser media core for StroyKalk v897 @ffmpeg/core 0.12.10, single-thread build. Copyright FFmpeg developers, ffmpeg.wasm contributors, and the linked codec library authors. License: GPL-2.0-or-later (see COPYING.GPLv2.txt), plus the compatible licenses of the linked libraries. Provided without warranty. This core is a separate media Worker component. Input files and generated media are not sent to the upstream projects or to any conversion API. Original package (fixed release): https://registry.npmjs.org/@ffmpeg/core/-/core-0.12.10.tgz Upstream build source, bindings and compilation scripts: https://github.com/ffmpegwasm/ffmpeg.wasm/tree/71aa99d37c02a7b4c435275ca9ef50e612f6efa1 FFmpeg source n5.1.4: https://github.com/FFmpeg/FFmpeg/tree/n5.1.4 The upstream Dockerfile pins the linked codec libraries and their source repositories. See source-manifest.json and Dockerfile.upstream for all dependency source URLs. Local changes, 2026-10-20: - ffmpeg-core.js getHeapMax reduced from 2147483648 to 536870912 bytes. - WASM memory section maximum reduced from 32768 to 8192 pages (512 MiB). - Initial memory remains 512 pages (32 MiB), memory remains unshared. No media codec code was changed. The reproducible transformation is patch-memory.py. The memory patch and this component are GPL-2.0-or-later. The site media wrapper only provides bounded allowlisted operations and terminates its Worker on completion, cancellation, errors, or timeout. It does not require SharedArrayBuffer, COOP, COEP, external CDN or server FFmpeg.